Background

Dr Micah Nehrings’ research interests are in: Mine Planning, Production Scheduling Optimisation, Optimal Ultimate Pit Limit (UPL) determination, planning for In-Pit-Crusher-Conveyor (IPCC) systems.

Micah is a Lecturer within the Division of Mining Engineering of the School of Mechanical and Mining Engineering. He leads the High Performance Surface Mining Research Group which is heavily focused on delivering high quality research outcomes in the planning and installation of In-Pit-Crusher-Conveyor (IPCC) systems.

Micah joined the School in 2011, after completing his PhD at The University of Queensland. Micah has since undertaken an early career academic program which has resulted in collaborations with European universities in Sweden, Germany and Kazakhstan. Micah has also developed an industry network that works with him in the implementation of some of his groups research outcomes.

Micah research outputs have been published in numerous high ranking journals including Minerals Engineering, Journal of the South African Institute of Mining and Metallurgy, Mining Technology and the International Journal of Mining, Reclamation and Environment.

Availability

Dr Micah Nehring is:
Available for supervision

Qualifications

  • Doctor of Philosophy, The University of Queensland

Research interests

  • Research Interests

    Mine Planning Production Scheduling Optimisation Mathematical Programming In-Pit-Crusher-Conveyor (IPCC) Systems

Works

Search Professor Micah Nehring’s works on UQ eSpace

80 works between 0027 and 2024

41 - 60 of 80 works

2019

Journal Article

Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations

Sinclair, N. and Nehring, M. (2019). Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations. Journal of the Southern African Institute of Mining and Metallurgy, 119 (1), 71-80. doi: 10.17159/2411-9717/2019/v119n1a9

Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations

2018

Journal Article

Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine

Terblanche, Petrus J., Kearney, Michael P., Nehring, Micah and Knights, Peter F. (2018). Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine. Mining Technology, 128 (1), 51-64. doi: 10.1080/25726668.2018.1554933

Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine

2018

Journal Article

A new methodology for the open-pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2018). A new methodology for the open-pit mine production scheduling problem. Omega, 81, 169-182. doi: 10.1016/j.omega.2017.10.008

A new methodology for the open-pit mine production scheduling problem

2018

Conference Publication

Selection of precision surface mining methods for complex metalliferous orebodies

Knights, P.F., Kizil, M.S. and Nehring, M. (2018). Selection of precision surface mining methods for complex metalliferous orebodies. Complex Orebodies Conference 2018, Brisbane, QLD Australia, 19-21 November 2018. Melbourne, VIC Australia: Australasian Institute of Mining and Metallurgy.

Selection of precision surface mining methods for complex metalliferous orebodies

2018

Journal Article

IPCC a real alternative

Nehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). IPCC a real alternative. Coal International, 266 (4), 28-39.

IPCC a real alternative

2018

Journal Article

A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems

Nehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems. International Journal of Mining Science and Technology, 28 (2), 205-214. doi: 10.1016/j.ijmst.2017.12.026

A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems

2018

Conference Publication

Open-pit mine production planning and scheduling: a research agenda

Samavati, Mehran, Essam, Daryl L., Nehring, Micah and Sarker, Ruhul (2018). Open-pit mine production planning and scheduling: a research agenda. 24th Australian Society for Operations Research (ASOR) Conference, Canberra, Australia, 16-18 November 2016. Cham, Switzerland: Springer International. doi: 10.1007/978-3-319-55914-8_16

Open-pit mine production planning and scheduling: a research agenda

2017

Journal Article

A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry. International Journal of Production Economics, 193, 12-20. doi: 10.1016/j.ijpe.2017.06.025

A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry

2017

Conference Publication

Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous Projects

Garcia, C.E.D., Scott, M. and Nehring, M. (2017). Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous Projects. Proceedings of the 2017 Mine Planning and Equipment Selection (MPES), Luleå, Sweden, 29-31 August 2017.

Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous Projects

2017

Journal Article

Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming

Salama, A., Nehring, M. and Greberg, J. (2017). Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming. Journal of the Southern African Institute of Mining and Metallurgy, 117 (4) v117n4a8, 365-372. doi: 10.17159/2411-9717/2017/v117n4a8

Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming

2017

Journal Article

The equipment utilisation versus mining rate trade-off in open pit mining

Arteaga, Felipe, Nehring, Micah and Knights, Peter (2017). The equipment utilisation versus mining rate trade-off in open pit mining. International Journal of Mining, Reclamation and Environment, 32 (7), 1-24. doi: 10.1080/17480930.2017.1306674

The equipment utilisation versus mining rate trade-off in open pit mining

2017

Journal Article

A local branching heuristic for the open pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A local branching heuristic for the open pit mine production scheduling problem. European Journal of Operational Research, 257 (1), 261-271. doi: 10.1016/j.ejor.2016.07.004

A local branching heuristic for the open pit mine production scheduling problem

2016

Journal Article

Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations

Copland, T. and Nehring, M. (2016). Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations. The Journal of the South African Institute of Mining and Metallurgy, 116 (12), 1135-1142. doi: 10.17159/2411-9717/2016/v116n12a7

Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations

2016

Journal Article

An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery

Nehring, M. and Cheng, X. (2016). An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery. Journal of Cleaner Production, 127, 228-239. doi: 10.1016/j.jclepro.2016.03.162

An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery

2016

Conference Publication

Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time

Dzakpata, Isaac, Knights, Peter, Kizil, Mehmet Siddik, Nehring, Micah and Aminossadati, Saiied Mostafa (2016). Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time. 2016 Coal Operators' Conference, Wollongong, Australia, 10-12 Feb 2016. Wollongong, Australia: The University of Wollongong Printery.

Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time

2016

Conference Publication

Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyond

Pinto, Pablo E., Hine, Damian C., Knights, Peter F. and Nehring, Micah (2016). Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyond. Academy of Management Meeting, Anaheim, California, 5 - 9 August 2016. Briarcliff Manor, NY, United States: Academy of Management. doi: 10.5465/AMBPP.2016.14430abstract

Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyond

2015

Journal Article

Development of dozer push optimisation software for commodore coal mine

Uren, Z. and Nehring, M. (2015). Development of dozer push optimisation software for commodore coal mine. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 124 (4), 231-238. doi: 10.1179/1743286315Y.0000000017

Development of dozer push optimisation software for commodore coal mine

2015

Journal Article

Market structure differences impacting australian iron ore and metallurgical coal industries

Lawrence, Kurt and Nehring, Micah (2015). Market structure differences impacting australian iron ore and metallurgical coal industries. Minerals, 5 (3), 473-487. doi: 10.3390/min5030473

Market structure differences impacting australian iron ore and metallurgical coal industries

2015

Journal Article

Evaluation of the impact of commodity price change on mine plan of underground mining

Salama, Abubakary, Nehring, Micah and Greberg, Jenny (2015). Evaluation of the impact of commodity price change on mine plan of underground mining. International Journal of Mining Science and Technology, 25 (3), 375-382. doi: 10.1016/j.ijmst.2015.03.008

Evaluation of the impact of commodity price change on mine plan of underground mining

2015

Conference Publication

First-year student engineers experience authentic practice with industry engagement

Aminossadati, Saiied M., Nehring, Micah, Hay, Edward, Kizil, Mehmet, Seib, Warren and Kavanagh, Lydia (2015). First-year student engineers experience authentic practice with industry engagement. Annual Conference of the Australasian Association for Engineering Education, Geelong, VIC, Australia, 6-9 December 2015. Victoria, Australia: School of Engineering Deakin University.

First-year student engineers experience authentic practice with industry engagement

Funding

Past funding

  • 2022 - 2023
    Research Services to Elaborate a Road Map for the Mine Design 4 ESG Initiative
    Anglo American Technical & Sustainability Services
    Open grant
  • 2021
    Quantification and Qualification of the Mechanical Properties of Thin Spray-on Liners Through Laboratory (Small) Scale Testing
    NewCrest Mining Limited
    Open grant
  • 2021 - 2022
    Predicting Roof Displacement in Underground Coal Mining Operations using Machine Learning
    Innovation Connections
    Open grant
  • 2018
    Rock Characteristics for Underground Hard Rock Mines in Australia and Asia Pacific
    Caterpillar Global Mining Europe GmbH
    Open grant
  • 2012 - 2013
    Integration of the mill throughput/recovery relationship into the optimal underground mine planning process
    UQ New Staff Research Start-Up Fund
    Open grant

Supervision

Availability

Dr Micah Nehring is:
Available for supervision

Before you email them, read our advice on how to contact a supervisor.

Supervision history

Current supervision

Completed supervision

Media

Enquiries

For media enquiries about Dr Micah Nehring's areas of expertise, story ideas and help finding experts, contact our Media team: