Skip to menu Skip to content Skip to footer
Dr Micah Nehring
Dr

Micah Nehring

Email: 
Phone: 
+61 7 336 53664

Overview

Background

Dr Micah Nehrings’ research interests are in: Mine Planning, Production Scheduling Optimisation, Optimal Ultimate Pit Limit (UPL) determination, planning for In-Pit-Crusher-Conveyor (IPCC) systems.

Micah is a Lecturer within the Division of Mining Engineering of the School of Mechanical and Mining Engineering. He leads the High Performance Surface Mining Research Group which is heavily focused on delivering high quality research outcomes in the planning and installation of In-Pit-Crusher-Conveyor (IPCC) systems.

Micah joined the School in 2011, after completing his PhD at The University of Queensland. Micah has since undertaken an early career academic program which has resulted in collaborations with European universities in Sweden, Germany and Kazakhstan. Micah has also developed an industry network that works with him in the implementation of some of his groups research outcomes.

Micah research outputs have been published in numerous high ranking journals including Minerals Engineering, Journal of the South African Institute of Mining and Metallurgy, Mining Technology and the International Journal of Mining, Reclamation and Environment.

Availability

Dr Micah Nehring is:
Available for supervision

Qualifications

  • Doctor of Philosophy, The University of Queensland

Research interests

  • Research Interests

    Mine Planning Production Scheduling Optimisation Mathematical Programming In-Pit-Crusher-Conveyor (IPCC) Systems

Works

Search Professor Micah Nehring’s works on UQ eSpace

80 works between 2006 and 2024

61 - 80 of 80 works

2015

Conference Publication

Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications

Dean, M., Knights, P., Kizil, M. S. and Nehring, M. (2015). Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications. AusIMM 2015 3rd International Future Mining Conference, Sydney, NSW, Australia, 4-6 Nov 2015. VIC, Australia: AusIMM.

Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications

2015

Journal Article

Development of Dozer Push Optimisation Software for Commodore Coal Mine

Uren, Z. and Nehring, M. (2015). Development of Dozer Push Optimisation Software for Commodore Coal Mine. Journal of Research Projects Review, 4 (1), 59-65.

Development of Dozer Push Optimisation Software for Commodore Coal Mine

2015

Conference Publication

First-year student engineers experience authentic practice with industry engagement

Aminossadati, Saiied M., Nehring, Micah, Hay, Edward, Kizil, Mehmet, Seib, Warren and Kavanagh, Lydia (2015). First-year student engineers experience authentic practice with industry engagement. Annual Conference of the Australasian Association for Engineering Education, Geelong, VIC, Australia, 6-9 December 2015. Victoria, Australia: School of Engineering Deakin University.

First-year student engineers experience authentic practice with industry engagement

2015

Conference Publication

A new branching scheme for the open pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2015). A new branching scheme for the open pit mine production scheduling problem. CIE 45: 2015 International Conference on Computers and Industrial Engineering, Lorraine, France, 28 -30 October 2015. Lorraine, France: Universite de Lorraine.

A new branching scheme for the open pit mine production scheduling problem

2014

Journal Article

A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution

Smith, C. B., Nehring, M. and Bosompem, M. K. (2014). A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution. Journal of Research Projects Review, 3 (1), 63-68.

A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution

2014

Conference Publication

Schemes of exploitation in open pit mining

Arteaga, Felipe, Nehring, Micah, Knights, Peter and Camus, Juan (2014). Schemes of exploitation in open pit mining. 22nd MPES Conference, Dresden, Germany, 14–19 October 2013. Cham, Switzerland: Springer International Publishing. doi: 10.1007/978-3-319-02678-7_126

Schemes of exploitation in open pit mining

2013

Journal Article

Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process

Yap, A., Saconi, F., Nehring, M., Arteaga, F., Pinto, P., Asad, M. W. A., Ozhigin, S., Ozhigina, S., Mozer, D., Nagibin, A., Pul, E., Shvedov, D., Ozhigin, D., Gorokhov, D. and Karatayeva, V. (2013). Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process. Minerals Engineering, 53, 74-83. doi: 10.1016/j.mineng.2013.06.005

Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process

2013

Journal Article

Operating value optimization using simulation and mixed integer programming

Salama, Abubakary, Nehring, Micah and Greberg, Jenny (2013). Operating value optimization using simulation and mixed integer programming. International Journal of Mining, Reclamation and Environment, 28 (1), 25-46. doi: 10.1080/17480930.2013.768019

Operating value optimization using simulation and mixed integer programming

2012

Journal Article

Integrated short- and medium-term underground mine production scheduling

Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012). Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 (5), 365-378.

Integrated short- and medium-term underground mine production scheduling

2011

Other Outputs

Integrated Production Schedule Optimisation for Sublevel Stoping Mines

Nehring, Micah (2011). Integrated Production Schedule Optimisation for Sublevel Stoping Mines. PhD Thesis, School of Mechanical and Mining Engineering, The University of Queensland.

Integrated Production Schedule Optimisation for Sublevel Stoping Mines

2010

Journal Article

A new mathematical programming model for production schedule optimization in underground mining operations

Nehring, M., Topal, E. and Little, J. (2010). A new mathematical programming model for production schedule optimization in underground mining operations. Journal of the South African Institute of Mining and Metallurgy, 110 (8), 437-446.

A new mathematical programming model for production schedule optimization in underground mining operations

2010

Conference Publication

An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling

Nehring, M., Topal, E., Kizil, M. and Knights, P. (2010). An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling. MPES2010: Mine Planning and Equipment Selection, Freemantle, Western Australia, 1-3 December, 2010. London , United Kingdom: IOM3.

An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling

2010

Journal Article

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming

Nehring, M., Topal, E. and Knights, P. (2010). Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 (4), 212-220. doi: 10.1179/1743286310Y.0000000001

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming

2009

Conference Publication

Adjusted real option valuation to maximise mining project value – A case study using century mine

Shafiee, S., Topal, E. and Nehring, M. (2009). Adjusted real option valuation to maximise mining project value – A case study using century mine. Project Evaluation Conference 2009, Melbourne, Australia, 21-22 April 2009. Carlton South, Vic.: Australasian Institute of Mining and Metallurgy.

Adjusted real option valuation to maximise mining project value – A case study using century mine

2009

Conference Publication

Estimating average total cost of open pit coal mines in Australia

Shafiee, S., Nehring, M. and Topal, E. (2009). Estimating average total cost of open pit coal mines in Australia. 2009 Australian Mining Technology Conference, Brisbane QLD, 27 - 28 October 2009. Carlton, Victoria: The Australasian Institute of Mining and Metallurgy.

Estimating average total cost of open pit coal mines in Australia

2009

Conference Publication

A New Short-Term Production Scheduling and Machine Allocation Model Using Mixed Interger Programming for Application in Sublevel Stope Mining Operations

Micah Nehring and Topal, E. (2009). A New Short-Term Production Scheduling and Machine Allocation Model Using Mixed Interger Programming for Application in Sublevel Stope Mining Operations. 2009 Australian Mining Technology Conference, Brisbane, Australia, 27-28 October 2009. Kenmore East, QLD, Australia: CRCMining.

A New Short-Term Production Scheduling and Machine Allocation Model Using Mixed Interger Programming for Application in Sublevel Stope Mining Operations

2008

Conference Publication

A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining

Little, J., Nehring, M. and Topal, E. (2008). A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining. 2008 Australian Mining Techology Conference, Twin Waters, Sunshine Coast, QLD, 16-18 September, 2008. Victoria, Australia: The Australasian Institute of Mining and Metallurgy.

A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining

2007

Conference Publication

Production schedule optimisation in underground hard rock mining using mixed integer programming

Nehring, M. and Topal, E. (2007). Production schedule optimisation in underground hard rock mining using mixed integer programming. Project Evaluation Conference 2007, Melbourne, Victoria, 19-20 June 2007. Melbourne, Victoria: The Australasian Institute of Mining and Metallurgy.

Production schedule optimisation in underground hard rock mining using mixed integer programming

2007

Conference Publication

Mixed integer programming model for mine production scheduling of sublevel stoping operation

Nehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sublevel stoping operation. 2007 Australian Mining Technology Conference, The Vines, WA Australia, 2-4 October 2007. Melbourne, VIC Australia: Australasian Institute of Mining and Metallurgy.

Mixed integer programming model for mine production scheduling of sublevel stoping operation

2006

Other Outputs

Stope sequencing and optimisation in underground hardrock mining

Nehring, Micah (2006). Stope sequencing and optimisation in underground hardrock mining. B.Sc Thesis, School of Engineering, The University of Queensland. doi: 10.14264/338655

Stope sequencing and optimisation in underground hardrock mining

Funding

Past funding

  • 2022 - 2023
    Research Services to Elaborate a Road Map for the Mine Design 4 ESG Initiative
    Anglo American Technical & Sustainability Services
    Open grant
  • 2021
    Quantification and Qualification of the Mechanical Properties of Thin Spray-on Liners Through Laboratory (Small) Scale Testing
    NewCrest Mining Limited
    Open grant
  • 2021 - 2022
    Predicting Roof Displacement in Underground Coal Mining Operations using Machine Learning
    Innovation Connections
    Open grant
  • 2018
    Rock Characteristics for Underground Hard Rock Mines in Australia and Asia Pacific
    Caterpillar Global Mining Europe GmbH
    Open grant
  • 2012 - 2013
    Integration of the mill throughput/recovery relationship into the optimal underground mine planning process
    UQ New Staff Research Start-Up Fund
    Open grant

Supervision

Availability

Dr Micah Nehring is:
Available for supervision

Before you email them, read our advice on how to contact a supervisor.

Supervision history

Current supervision

Completed supervision

Media

Enquiries

For media enquiries about Dr Micah Nehring's areas of expertise, story ideas and help finding experts, contact our Media team:

communications@uq.edu.au