|
2011 Other Outputs Integrated Production Schedule Optimisation for Sublevel Stoping MinesNehring, Micah (2011). Integrated Production Schedule Optimisation for Sublevel Stoping Mines. PhD Thesis, School of Mechanical and Mining Engineering, The University of Queensland. |
|
2006 Other Outputs Stope sequencing and optimisation in underground hardrock miningNehring, Micah (2006). Stope sequencing and optimisation in underground hardrock mining. B.Sc Thesis, School of Engineering, The University of Queensland. doi: 10.14264/338655 |