2021

Journal Article

A new mathematical formulation for underground cut-off grade determination in the presence of pre-concentration systems

Sotoudeh, Farzad, Nehring, Micah, Kizil, Mehmet, Knights, Peter and Mousavi, Amin (2021). A new mathematical formulation for underground cut-off grade determination in the presence of pre-concentration systems. Natural Resources Research, 30 (5), 3241-3259. doi: 10.1007/s11053-021-09892-8

A new mathematical formulation for underground cut-off grade determination in the presence of pre-concentration systems

2020

Journal Article

Production scheduling optimisation for sublevel stoping mines using mathematical programming: a review of literature and future directions

Sotoudeh, Farzad, Nehring, Micah, Kizil, Mehmet, Knights, Peter and Mousavi, Amin (2020). Production scheduling optimisation for sublevel stoping mines using mathematical programming: a review of literature and future directions. Resources Policy, 68 101809, 101809. doi: 10.1016/j.resourpol.2020.101809

Production scheduling optimisation for sublevel stoping mines using mathematical programming: a review of literature and future directions

2020

Journal Article

The impact of equipment productivity and pushback width on the mine planning process

Araya, A. S., Nehring, M., Vega, E. T. and Miranda, N. S. (2020). The impact of equipment productivity and pushback width on the mine planning process. Journal of the Southern African Institute of Mining and Metallurgy, 120 (10), 599-607.

The impact of equipment productivity and pushback width on the mine planning process

2020

Journal Article

Integrated underground mining and pre-concentration systems; a critical review of technical concepts and developments

Sotoudeh, Farzad, Nehring, Micah, Kizil, Mehmet and Knights, Peter (2020). Integrated underground mining and pre-concentration systems; a critical review of technical concepts and developments. International Journal of Mining, Reclamation and Environment, 35 (3), 1-30. doi: 10.1080/17480930.2020.1782573

Integrated underground mining and pre-concentration systems; a critical review of technical concepts and developments

2020

Journal Article

Production planning and scheduling in mining scenarios under IPCC mining systems

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2020). Production planning and scheduling in mining scenarios under IPCC mining systems. Computers & Operations Research, 115 104714, 104714. doi: 10.1016/j.cor.2019.05.019

Production planning and scheduling in mining scenarios under IPCC mining systems

2020

Journal Article

An analysis of full truck versus full bucket strategies in open pit mining loading and hauling operations

Tapia, E., Salazar Araya, A., Saavedra, N., Nehring, M. and Mora, J. (2020). An analysis of full truck versus full bucket strategies in open pit mining loading and hauling operations. International Journal of Mining, Reclamation and Environment, 35 (1), 1-11. doi: 10.1080/17480930.2020.1712639

An analysis of full truck versus full bucket strategies in open pit mining loading and hauling operations

2020

Journal Article

Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems

Hay, Edward, Nehring, Micah, Knights, Peter and Kizil, Mehmet S. (2020). Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems. International Journal of Mining and Mineral Engineering, 10 (2-4), 111-130. doi: 10.1504/ijmme.2019.10026187

Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems

2019

Journal Article

Determining the optimal orientation of ultimate pits for mines using fully mobile in-pit crushing and conveying systems

Hay, E., Nehring, M., Knights, P. and Kizil, M. S. (2019). Determining the optimal orientation of ultimate pits for mines using fully mobile in-pit crushing and conveying systems. Journal of the Southern African Institute of Mining and Metallurgy, 119 (11), 949-956. doi: 10.17159/2411-9717/104-252-1/2019

Determining the optimal orientation of ultimate pits for mines using fully mobile in-pit crushing and conveying systems

2019

Journal Article

Simultaneous optimization of stope layout and production scheduling in sublevel stoping method

Foroughi, Sorayya, Hamidi, Jafar Khademi, Monjezi, Masoud and Nehring, Micah (2019). Simultaneous optimization of stope layout and production scheduling in sublevel stoping method. Nashriyyah-i Muhandisi-i Ma'dan, 14 (43), 81-90. doi: 10.22034/IJME.2019.36641

Simultaneous optimization of stope layout and production scheduling in sublevel stoping method

2019

Journal Article

The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)

Foroughi, Sorayya, Hamidi, Jafar Khademi, Monjezi, Masoud and Nehring, Micah (2019). The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II). Resources Policy, 63 101408, 101408. doi: 10.1016/j.resourpol.2019.101408

The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)

2019

Journal Article

Ultimate pit limit determination for semi mobile in-pit crushing and conveying system: a case study

Hay, E., Nehring, M., Knights, P. and Kizil, M.S. (2019). Ultimate pit limit determination for semi mobile in-pit crushing and conveying system: a case study. International Journal of Mining, Reclamation and Environment, 34 (7), 1-21. doi: 10.1080/17480930.2019.1639006

Ultimate pit limit determination for semi mobile in-pit crushing and conveying system: a case study

2019

Journal Article

Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations

Sinclair, N. and Nehring, M. (2019). Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations. Journal of the Southern African Institute of Mining and Metallurgy, 119 (1), 71-80. doi: 10.17159/2411-9717/2019/v119n1a9

Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations

2018

Journal Article

Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine

Terblanche, Petrus J., Kearney, Michael P., Nehring, Micah and Knights, Peter F. (2018). Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine. Mining Technology, 128 (1), 51-64. doi: 10.1080/25726668.2018.1554933

Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine

2018

Journal Article

A new methodology for the open-pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2018). A new methodology for the open-pit mine production scheduling problem. Omega, 81, 169-182. doi: 10.1016/j.omega.2017.10.008

A new methodology for the open-pit mine production scheduling problem

2018

Journal Article

IPCC a real alternative

Nehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). IPCC a real alternative. Coal International, 266 (4), 28-39.

IPCC a real alternative

2018

Journal Article

A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems

Nehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems. International Journal of Mining Science and Technology, 28 (2), 205-214. doi: 10.1016/j.ijmst.2017.12.026

A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems

2017

Journal Article

A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry. International Journal of Production Economics, 193, 12-20. doi: 10.1016/j.ijpe.2017.06.025

A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry

2017

Journal Article

Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming

Salama, A., Nehring, M. and Greberg, J. (2017). Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming. Journal of the Southern African Institute of Mining and Metallurgy, 117 (4) v117n4a8, 365-372. doi: 10.17159/2411-9717/2017/v117n4a8

Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming

2017

Journal Article

The equipment utilisation versus mining rate trade-off in open pit mining

Arteaga, Felipe, Nehring, Micah and Knights, Peter (2017). The equipment utilisation versus mining rate trade-off in open pit mining. International Journal of Mining, Reclamation and Environment, 32 (7), 1-24. doi: 10.1080/17480930.2017.1306674

The equipment utilisation versus mining rate trade-off in open pit mining

2017

Journal Article

A local branching heuristic for the open pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A local branching heuristic for the open pit mine production scheduling problem. European Journal of Operational Research, 257 (1), 261-271. doi: 10.1016/j.ejor.2016.07.004

A local branching heuristic for the open pit mine production scheduling problem