2025 Journal Article Private commissions of public inquiry: community conflict and multilayer dissonance in the mining industryHarris, Jill, Kemp, Deanna and Owen, John R. (2025). Private commissions of public inquiry: community conflict and multilayer dissonance in the mining industry. Corporate Social Responsibility and Environmental Management. doi: 10.1002/csr.3103 |
2024 Journal Article Disaster scenes as a foundation for emergency response planningOwen, John R., Kemp, Deanna, van der Watt, Phia, Harris, Jill, Ang Li Ern, Michelle and Marais, Lochner (2024). Disaster scenes as a foundation for emergency response planning. International Journal of Disaster Risk Reduction, 113 104795, 1-15. doi: 10.1016/j.ijdrr.2024.104795 |
2024 Journal Article Disclosure hesitancy and disaster risk: a survey of tailings professionals in the global mining industryKemp, Deanna, Sharma, Vigya, Harris, Jill, Blitz, Nellie and Williams, David (2024). Disclosure hesitancy and disaster risk: a survey of tailings professionals in the global mining industry. Minerals Engineering, 215 108821, 1-11. doi: 10.1016/j.mineng.2024.108821 |
2024 Journal Article The catastrophic failure of the Jagersfontein tailings dam: an industrial disaster 150 years in the makingMarais, Lochner, Kemp, Deanna, van der Watt, Phia, Matebesi, Sethulego, Cloete, Jan, Harris, Jill, Ang Li Ern, Michelle and Owen, John R. (2024). The catastrophic failure of the Jagersfontein tailings dam: an industrial disaster 150 years in the making. International Journal of Disaster Risk Reduction, 109 104585, 1-13. doi: 10.1016/j.ijdrr.2024.104585 |
2024 Journal Article Fatigue management in mining: current practices and future directionsHorberry, Tim, Harris, Jill, Cliff, David, Dodshon, Philippa, Lee, Joanna, Lim, Nigel and Way, Kïrsten (2024). Fatigue management in mining: current practices and future directions. Journal of Work Health and Safety Regulation 23-004. doi: 10.57523/jaohlev.oa.23-004 |
2024 Journal Article Development and reliability review of an assessment tool to measure competency in the seven elements of the risk management process: part three—evaluation of the group results from the RISK ToolMarling, Garry, Horberry, Tim and Harris, Jill (2024). Development and reliability review of an assessment tool to measure competency in the seven elements of the risk management process: part three—evaluation of the group results from the RISK Tool. Safety, 10 (1) 29. doi: 10.3390/safety10010029 |
2023 Other Outputs Fatigue management in the Queensland mining industry and its relationship with mental health: final report to Office of the Commissioner Resources Safety and HealthHorberry, T. , Harris, J. , Way, K. , Hill, A. , Lim, N. , Dodshon, P. , Lee, J. and Cliff, D. (2023). Fatigue management in the Queensland mining industry and its relationship with mental health: final report to Office of the Commissioner Resources Safety and Health. Brisbane, Australia: Queensland Government. |
2023 Journal Article Energy transition minerals and their intersection with land-connected peoplesOwen, John R., Kemp, Deanna, Lechner, Alex M., Harris, Jill, Zhang, Ruilian and Lèbre, Éléonore (2023). Energy transition minerals and their intersection with land-connected peoples. Nature Sustainability, 6 (2), 203-211. doi: 10.1038/s41893-022-00994-6 |
2023 Journal Article Author Correction: Energy transition minerals and their intersection with land-connected peoplesOwen, John R., Kemp, Deanna, Lechner, Alex M., Harris, Jill, Zhang, Ruilian and Lèbre, Éléonore (2023). Author Correction: Energy transition minerals and their intersection with land-connected peoples. Nature Sustainability, 6 (8), 1024-1024. doi: 10.1038/s41893-022-01057-6 |
2022 Journal Article Development and Reliability Review of an Assessment Tool to Measure Competency in the Seven Elements of the Risk Management Process: Part Two—Evaluation of the Individual Results from the RISKometric ToolMarling, Garry, Horberry, Tim and Harris, Jill (2022). Development and Reliability Review of an Assessment Tool to Measure Competency in the Seven Elements of the Risk Management Process: Part Two—Evaluation of the Individual Results from the RISKometric Tool. Safety, 8 (4) 71, 1-14. doi: 10.3390/safety8040071 |
2022 Journal Article Fast track to failure? Energy transition minerals and the future of consultation and consentOwen, John R., Kemp, Deanna, Harris, Jill, Lechner, Alex M. and Lebre, Eleonore (2022). Fast track to failure? Energy transition minerals and the future of consultation and consent. Energy Research and Social Science, 89 102665, 1-14. doi: 10.1016/j.erss.2022.102665 |
2021 Other Outputs Diagnostic review of the social performance function of an international mining companyKung, Anthony, Kemp, Deanna, Owen, John, Johnston, Susan, Bainton, Nick, Harris, Jill and Lèbre, Éléonore (2021). Diagnostic review of the social performance function of an international mining company. Brisbane, Australia: Centre for Social Responsibility in Mining, Sustainable Minerals Institute, The University of Queensland. |
2021 Journal Article A global vulnerability analysis of displacement caused by resource development projectsOwen, J. R., Kemp, D., Lèbre, É., Harris, J. and Svobodova, K. (2021). A global vulnerability analysis of displacement caused by resource development projects. The Extractive Industries and Society, 8 (2) 100877, 100877. doi: 10.1016/j.exis.2021.01.012 |
2021 Journal Article The global energy transition and place attachment in coal mining communities: implications for heavily industrialized landscapesSvobodova, K., Owen, J. R. and Harris, J. (2021). The global energy transition and place attachment in coal mining communities: implications for heavily industrialized landscapes. Energy Research and Social Science, 71 101831, 101831. doi: 10.1016/j.erss.2020.101831 |
2021 Journal Article Development and reliability review of an assessment tool to measure competency in the seven elements of the risk management process: Part one—the riskometricMarling, Garry, Horberry, Tim and Harris, Jill (2021). Development and reliability review of an assessment tool to measure competency in the seven elements of the risk management process: Part one—the riskometric. Safety, 7 (1) 1, 1-11. doi: 10.3390/safety7010001 |
2020 Other Outputs An information sharing system for vehicle interactions: ACARP C28048 reportHarris, Jill and Cliff, David (2020). An information sharing system for vehicle interactions: ACARP C28048 report. Brisbane, Australia: ACARP. |
2020 Other Outputs Aboriginal employment outcomes at Argyle Diamond Mine: survey of current and former employees.Parmenter, Joni, Harris, Jill and Alexander, Rowena (2020). Aboriginal employment outcomes at Argyle Diamond Mine: survey of current and former employees.. Brisbane, QLD, Australia: Centre for Social Responsibility. |
2020 Journal Article Complexities and contradictions in the global energy transition: a re-evaluation of country-level factors and dependenciesSvobodova, K., Owen, J. R., Harris, J. and Worden, S. (2020). Complexities and contradictions in the global energy transition: a re-evaluation of country-level factors and dependencies. Applied Energy, 265 114778, 114778. doi: 10.1016/j.apenergy.2020.114778 |
2020 Other Outputs West Musgrave Project SIOA: demographic studyKung, Anthony, Harris, Jill and Owen, John (2020). West Musgrave Project SIOA: demographic study. Brisbane, Australia: Centre for Social Responsibility in Mining, Sustainable Minerals Institute, The University of Queensland. |
2019 Journal Article Development and validation of plain english interpretations of the seven elements of the risk management processMarling, Garry, Horberry, Tim and Harris, Jill (2019). Development and validation of plain english interpretations of the seven elements of the risk management process. Safety, 5 (4) safety5040075, 75. doi: 10.3390/safety5040075 |