Skip to menu Skip to content Skip to footer

2013

Conference Publication

Grizzly modifications at Ridgeway Deeps Block Cave Mine

Costello, C. and Knights, P. (2013). Grizzly modifications at Ridgeway Deeps Block Cave Mine. Mining Education Australia (MEA) Student Conference, Kalgoorlie, WA, Australia, 12 October 2012. Carlton, VIC, Australia: The Australasian Institute of Mining and Metallurgy (AusIMM).

Grizzly modifications at Ridgeway Deeps Block Cave Mine

2013

Conference Publication

Esquema integrado de decisiones para el manejo de repuestos criticos en contratos de mantenimiento

Godoy, D., Pascual, R. and Knights, P. (2013). Esquema integrado de decisiones para el manejo de repuestos criticos en contratos de mantenimiento. MAPLA 2013: 10º Encuentro Internacional de Mantenedores de Plantas, Santiago, Chile, 4-6 September, 2013. Santiago, Chile: Gecamin.

Esquema integrado de decisiones para el manejo de repuestos criticos en contratos de mantenimiento

2013

Journal Article

Speed, coordination and individualistic behaviors: a pilot NK modeling study to investigate the moderating effects of organizational structure on performance in individual firms

Pinto Cornejo, Pablo E., Montecinos A., Jorge G., Hine, Damian, Knights, Peter and Valdebenito Pedrero, Felipe (2013). Speed, coordination and individualistic behaviors: a pilot NK modeling study to investigate the moderating effects of organizational structure on performance in individual firms. Esic Market Economic and Business Journal, 44 (2), 109-126. doi: 10.7200/esicm.145.0442.3i

Speed, coordination and individualistic behaviors: a pilot NK modeling study to investigate the moderating effects of organizational structure on performance in individual firms

2012

Journal Article

Integrated short- and medium-term underground mine production scheduling

Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012). Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 (5), 365-378.

Integrated short- and medium-term underground mine production scheduling

2012

Book Chapter

An analysis of the SAFEMine Global Positioning System Collision Avoidance System

Knights, B and Kizil, M.S (2012). An analysis of the SAFEMine Global Positioning System Collision Avoidance System. Mining education Australia: research projects review 2011. (pp. 23-29) edited by Paul Hagan. Carton, VIC, Australia: The Australasian Institute of Mining and Metallurgy.

An analysis of the SAFEMine Global Positioning System Collision Avoidance System

2012

Conference Publication

Speed, coordination and individualistic behaviors: an NK modeling approach to investigate the moderating effects of organizational structure on performance in individual firms

Pinto, Pablo Ernesto, Montecinos, Jorge, Pedrero, Filipe Valdebenito, Hine, Damian and Knights, Peter (2012). Speed, coordination and individualistic behaviors: an NK modeling approach to investigate the moderating effects of organizational structure on performance in individual firms. XLVII CLADEA Annual Assembly 2012, Lima, Peru, 22 - 24 October 2012. Lima, Peru: Universidad Esan.

Speed, coordination and individualistic behaviors: an NK modeling approach to investigate the moderating effects of organizational structure on performance in individual firms

2012

Conference Publication

Cultural challenges in Chinese/Australian mining mergers and acquisitions - a CEO's perspective

Liang, W., Zhu, Y. and Knights, P. (2012). Cultural challenges in Chinese/Australian mining mergers and acquisitions - a CEO's perspective. International Mine Management Conference 2012, Melbourne, Australia, 20-21 November 2012. Melbourne, Australia: AusIMM: Australasian Institute of Mining and Metallurgy.

Cultural challenges in Chinese/Australian mining mergers and acquisitions - a CEO's perspective

2012

Conference Publication

Review of In-pit Crusher Conveyor (IPCC) application

Londono, Juan G., Knights, Peter and Kizil, Mehmet (2012). Review of In-pit Crusher Conveyor (IPCC) application. 2012 Australian Mining Technology Conference, Perth, Australia, 8-10 October 2012. Kenmore East, QLD, Australia: CRCMining Australia.

Review of In-pit Crusher Conveyor (IPCC) application

2011

Conference Publication

Improving truck-shovel matching

Nel, S., Kizil, M. S. and Knights, P. (2011). Improving truck-shovel matching. 35th APCOM Symposium, Wollongong, NSW, Australia, 24-30 September 2011. Carlton, VIC, Australia: Australasian Institute of Mining and Metallurgy.

Improving truck-shovel matching

2011

Conference Publication

Doing more with less: How to improve maintainance labour utilisation

Knights, Peter (2011). Doing more with less: How to improve maintainance labour utilisation. 8th International Mining Plant Maintenance Meeting (MAPLA 2011), Antofagasta, Chile, 7-9 September 2011. Santiago, Chile: Gecamin.

Doing more with less: How to improve maintainance labour utilisation

2011

Conference Publication

Mine data analytics - New skills required for tomorrow's mines

Knights, P. and Liang, L. (2011). Mine data analytics - New skills required for tomorrow's mines. Second International Future Mining Conference, Sydney, Australia, 22 - 23 November 2011. Carlton, Australia: The Australasian Institute of Mining & Metallurgy.

Mine data analytics - New skills required for tomorrow's mines

2011

Journal Article

Simultaneous optimisation of stope layouts and long term production schedules

Little, J., Topal, E. and Knights, P. (2011). Simultaneous optimisation of stope layouts and long term production schedules. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 120 (3), 129-136. doi: 10.1179/1743286311Y.0000000011

Simultaneous optimisation of stope layouts and long term production schedules

2011

Conference Publication

Critical spare parts ordering decisions using conditional reliability and stochastic lead time

Godoy, David, Pascual, Rodrigo and Knights, Peter (2011). Critical spare parts ordering decisions using conditional reliability and stochastic lead time. 8th International Mining Plant Maintenance Meeting (MAPLA 2011), Antofagasta, Chile, 7-9 September 2011. Santiago, Chile: Gecamin.

Critical spare parts ordering decisions using conditional reliability and stochastic lead time

2011

Book Chapter

Mine infrastructure maintenance

Kumar, Uday, Knights, Peter and Kuruppu, Mahinda (2011). Mine infrastructure maintenance. SME mining engineering handbook. (pp. 825-838) edited by Peter Darling. Colorado, USA: Society for Mining, Metallurgy, and Exploration.

Mine infrastructure maintenance

2011

Conference Publication

Types and traps: R&D consortia and developmental pitfalls

Pinto, Pablo E., Hine, Damian and Knights, Peter (2011). Types and traps: R&D consortia and developmental pitfalls. DRUID Society Conference 2011 on Innovation, Strategy and Structure - Organizations, Institutions, Systems and Regions, Copenhagen, Denmark, 15-17 June 2011. Copenhagen, Denmark: DRUID Society.

Types and traps: R&D consortia and developmental pitfalls

2010

Journal Article

Coal and the Commonwealth: The greatness of an Australian resource

Knights, Peter and Hood, Michael (2010). Coal and the Commonwealth: The greatness of an Australian resource. AusIMM Bulletin (1), 48-50.

Coal and the Commonwealth: The greatness of an Australian resource

2010

Conference Publication

Payload variance effects on truck bunching

Knights, P. F. and Paton, S. (2010). Payload variance effects on truck bunching. Seventh Large Open Pit Mining Conference 2010, Perth, W.A., Australia, 27-28 July 2010. Carlton, Vic., Australia: The Australasian Institute of Mining and Metallurgy.

Payload variance effects on truck bunching

2010

Conference Publication

An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling

Nehring, M., Topal, E., Kizil, M. and Knights, P. (2010). An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling. MPES2010: Mine Planning and Equipment Selection, Freemantle, Western Australia, 1-3 December, 2010. London , United Kingdom: IOM3.

An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling

2010

Conference Publication

Autonomous surface mining equipment: is bigger better?

Knights, Peter and Franklin, Dennis (2010). Autonomous surface mining equipment: is bigger better?. 2010 Australian Mining Technology Conference, Perth, Western Australian, 13-15 September 2010. Pinjarra Hills, Qld, Australia: CRC Mining.

Autonomous surface mining equipment: is bigger better?

2010

Journal Article

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming

Nehring, M., Topal, E. and Knights, P. (2010). Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 (4), 212-220. doi: 10.1179/1743286310Y.0000000001

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming