|
2024 Conference Publication Sufficient geotechnical data for reliable mine designvan As, A. and Noppe, M. (2024). Sufficient geotechnical data for reliable mine design. Massmin 2024, Kiruna, Sweden, 17-19 September 2024. Luleå, Sweden: Mining and Rock Engineering. |
|
2018 Journal Article Improving assurance for Mineral Resource and Ore Reserve estimates and reportingNoppe, Mark (2018). Improving assurance for Mineral Resource and Ore Reserve estimates and reporting. AusIMM Bulletin (3), 38-40. |
|
2016 Conference Publication A framework for presenting and benchmarking resource projectsNoppé, M. A. (2016). A framework for presenting and benchmarking resource projects. Australasian Institute of Mining and Metallurgy. |
|
2015 Conference Publication The measurement and control of dilution in an underground coal operationNoppé, M. (2015). The measurement and control of dilution in an underground coal operation. Society for Mining, Metallurgy and Exploration. |
|
2014 Journal Article Communicating confidence in Mineral Resources and Mineral ReservesNoppe, M. A. (2014). Communicating confidence in Mineral Resources and Mineral Reserves. Journal of the Southern African Institute of Mining and Metallurgy, 114 (3), 213-222. |
|
2014 Journal Article The 2012 JORC code - What minerals consultants and stakeholders need to knowNoppe, Mark (2014). The 2012 JORC code - What minerals consultants and stakeholders need to know. AusIMM Bulletin (2), 54-56. |
|
2007 Conference Publication Assessing underground mining potential at ernest henry mine using conditional simulation and stope optimisationMyers, P., Standing, C., Collier, P. and Noppé, M. (2007). Assessing underground mining potential at ernest henry mine using conditional simulation and stope optimisation. |
|
2005 Conference Publication Assessing underground mining potential at Ernest!Henry mine using conditional simulation and stope optimisationMyers, P., Standing, C., Collier, P. and Noppe, M. (2005). Assessing underground mining potential at Ernest!Henry mine using conditional simulation and stope optimisation. International Symposium on Orebody Modelling and Strategic Mine Planning, Perth Australia, Nov 22-23, 2004. PARKVILLE VICTORIA: AUSTRALASIAN INST MINING & METALLURGY. |
|
2005 Conference Publication Investigation of alternative drawpoint sampling at Ridgeway Mine, NSWSmart, G., Rutter, J. and Noppe, M. (2005). Investigation of alternative drawpoint sampling at Ridgeway Mine, NSW. 2nd World Conference on Sampling and Blending, Sunshine Coast Australia, May 10-12, 2005. PARKVILLE VICTORIA: AUSTRALASIAN INST MINING & METALLURGY. |
|
2003 Conference Publication The measurement and control of dilution in an underground coal operationNoppe, M. (2003). The measurement and control of dilution in an underground coal operation. 5th International Mining Geology Conference, Bendigo Australia, Nov 17-19, 2003. PARKVILLE VICTORIA: AUSTRALASIAN INST MINING & METALLURGY. |
|
2002 Conference Publication Dealing With Demands of Technical Variability and Uncertainty Along the Mine Value ChainSnowden, D. V., Glacken, I. and Noppe, M. (2002). Dealing With Demands of Technical Variability and Uncertainty Along the Mine Value Chain. |
|
2002 Journal Article Errors and uncertainty in mineral resource and ore reserve estimation: The importance of getting it rightDominy, Simon C., Noppé, Mark A. and Annels, Alwyn E. (2002). Errors and uncertainty in mineral resource and ore reserve estimation: The importance of getting it right. Exploration and Mining Geology, 11 (1-4), 77-98. doi: 10.2113/11.1-4.77 |
|
2000 Conference Publication Mining bench height evaluation for the Wallaby resource - A conditional simulation case studyGlacken, IM, Noppé, M and Titley, M (2000). Mining bench height evaluation for the Wallaby resource - A conditional simulation case study. 4th International Mining Geology Conference, Coolum Australia, May 14-17, 2000. PARKVILLE VICTORIA: AUSTRALASIAN INST MINING & METALLURGY. |