|
2021 Other Outputs A complex orebodies review of the Izok Lake Corridor Project: final report 1Verster, Lizette, Antonio, Christian and Ziemski, Marcin (2021). A complex orebodies review of the Izok Lake Corridor Project: final report 1. Brisbane, QLD Australia: Sustainable Minerals Institute. |
|
2021 Other Outputs GLENCON10 - Circuit Survey of Mt Isa Copper Concentrator Pre-Float CircuitLizette Verster, Kym Runge and Susana Brito e Abreu (2021). GLENCON10 - Circuit Survey of Mt Isa Copper Concentrator Pre-Float Circuit. Brisbane: Sustainable Minerals Institute - JKMRC. |
|
2021 Other Outputs GLENCON10 - circuit survey of Mt Isa copper concentrator pre-float circuit - ToF-SIMS analysisBrito e Abreu, Susana, Verster, Lizette, Forbes, Liza and Runge, Kym (2021). GLENCON10 - circuit survey of Mt Isa copper concentrator pre-float circuit - ToF-SIMS analysis. Brisbane, QLD Australia: Sustainable Minerals Institute - Julius Kruttschnitt Mineral Research Centre. |
|
2020 Conference Publication Application of new technologies for remote operational support in metallurgical plantsYahyaei, Mohsen, Verster, Isabella, Wong, Bevin, Valenta, Rick, Ziemski, Marcin and O'Donnell, Roxanne (2020). Application of new technologies for remote operational support in metallurgical plants. 16th International Mineral Processing Conference, Santiago, Chile (Online), 23-27 November 2020. Santiago, Chile: Universidad de Concepción. |