Skip to menu Skip to content Skip to footer
Professor Peter Knights
Professor

Peter Knights

Email: 
Phone: 
+61 7 336 53915

Overview

Background

Prof Peter Knights’ research interests are in: engineering asset management, mine maintenace and systems engineering applied to mine safety and mine planning.

Professor Knights is Discipline Lead for Mining within the School of Mechanical and Mining Engineering..

From 2006-2015 he held the BMA Chair in Mining Enginereing with the University of Queensland. From 1996 to 2004 he was employed as an Assistant Professor with the Faculty of Engineering of the Catholic University of Chile, based in Santiago, Chile. He was subsequently named as Associate Professor and Canadian Chair in Mining. Peter holds a Bachelor’s degree in Mechanical Engineering for the University of Melbourne, Australia, a Masters degree in Systems Engineering from the Royal Melbourne Institute of Technology and a Ph.D. in Mining Engineering from McGill University, Canada.

His recent work has focussed on incorporating ESG concerns into early stage mine planning and electrification systems for decarbonising mine haulage. He has a number of publications in prestigious international journals such as the Journal for Quality in Maintenance Engineering and the Journal of Reliability Engineering and System Safety.

Capability areas

  • Asset management and mine maintenance
  • Incorporating ESG into eary styage mine design
  • Systems safety.

Availability

Professor Peter Knights is:
Available for supervision

Qualifications

  • Bachelor (Honours) of Engineering, University of Melbourne
  • Masters (Coursework) of Engineering, University of Melbourne
  • Doctor of Philosophy, McGill University

Research impacts

Prof. Knights has an extensive history of research collaboration with industry. In Chile, Prof Knights produced a series of pioneering papers that applied statistical cost modelling to quantify unscheduled/scheduled maintenance ratios for mobile mining equipment. He developed the Jack-knife approach for classifying chronic unplanned maintenance downtime events, now incorporated into GE Wabtec’s APS software which is in regular use by a number of large mining companies. Whilst Program Leader for the Smart Mining Systems group for CRCMining (2005-2014) Prof. Knights led the development of ValueTree software that was later adopted for use by Rio Tinto Iron Ore and is now available as a software product from Concerto Analytics. Prof. Knights also led a team evaluating the use of fully mobile in-pit crushing conveyor systems (FMIPCC) in large surface mines. This includes the development of an integrated Time Usage Model and a novel algorithm for determining ultimate pit limits for metalliferous mines employing FMIPCC systems. More recently, his work has focused on how to incoporate ESG concerns into easrly stage mine planning and safety improvements related to wheel and tyre handling for mining haul trucks, a leading cause of fatalities and accidents in surface mining.

Works

Search Professor Peter Knights’s works on UQ eSpace

153 works between 1990 and 2024

81 - 100 of 153 works

2013

Conference Publication

Management of trailing cables on electrically powered load-haul-dump units

Paterson, W. and Knights, P. (2013). Management of trailing cables on electrically powered load-haul-dump units. Mining Education Australia (MEA) Student Conference, Kalgoorlie, WA, Australia, 12 October 2012. Carlton, VIC, Australia: The Australasian Institute of Mining and Metallurgy (AusIMM).

Management of trailing cables on electrically powered load-haul-dump units

2013

Conference Publication

Are safe mines reliable mines?

Knights, Peter (2013). Are safe mines reliable mines?. MANTEMIN 2013: 8º Encuentro Internacional de Mantenedores de Equipos Mina, Santiago, Chile, 4-6 September, 2013. Santiago, Chile: Gecamin.

Are safe mines reliable mines?

2013

Conference Publication

Are safe mines reliable mines?

Knights, Peter (2013). Are safe mines reliable mines?. MAPLA 2013: 10º Encuentro Internacional de Mantenedores de Plantas, Santiago, Chile, 4-6 September, 2013. Santiago, Chile: Gecamin.

Are safe mines reliable mines?

2012

Journal Article

Integrated short- and medium-term underground mine production scheduling

Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012). Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 (5), 365-378.

Integrated short- and medium-term underground mine production scheduling

2012

Conference Publication

Cultural challenges in Chinese/Australian mining mergers and acquisitions - a CEO's perspective

Liang, W., Zhu, Y. and Knights, P. (2012). Cultural challenges in Chinese/Australian mining mergers and acquisitions - a CEO's perspective. International Mine Management Conference 2012, Melbourne, Australia, 20-21 November 2012. Melbourne, Australia: AusIMM: Australasian Institute of Mining and Metallurgy.

Cultural challenges in Chinese/Australian mining mergers and acquisitions - a CEO's perspective

2012

Conference Publication

Review of In-pit Crusher Conveyor (IPCC) application

Londono, Juan G., Knights, Peter and Kizil, Mehmet (2012). Review of In-pit Crusher Conveyor (IPCC) application. 2012 Australian Mining Technology Conference, Perth, Australia, 8-10 October 2012. Kenmore East, QLD, Australia: CRCMining Australia.

Review of In-pit Crusher Conveyor (IPCC) application

2012

Book Chapter

An analysis of the SAFEMine Global Positioning System Collision Avoidance System

Knights, B and Kizil, M.S (2012). An analysis of the SAFEMine Global Positioning System Collision Avoidance System. Mining education Australia: research projects review 2011. (pp. 23-29) edited by Paul Hagan. Carton, VIC, Australia: The Australasian Institute of Mining and Metallurgy.

An analysis of the SAFEMine Global Positioning System Collision Avoidance System

2012

Conference Publication

Speed, coordination and individualistic behaviors: an NK modeling approach to investigate the moderating effects of organizational structure on performance in individual firms

Pinto, Pablo Ernesto, Montecinos, Jorge, Pedrero, Filipe Valdebenito, Hine, Damian and Knights, Peter (2012). Speed, coordination and individualistic behaviors: an NK modeling approach to investigate the moderating effects of organizational structure on performance in individual firms. XLVII CLADEA Annual Assembly 2012, Lima, Peru, 22 - 24 October 2012. Lima, Peru: Universidad Esan.

Speed, coordination and individualistic behaviors: an NK modeling approach to investigate the moderating effects of organizational structure on performance in individual firms

2011

Conference Publication

Critical spare parts ordering decisions using conditional reliability and stochastic lead time

Godoy, David, Pascual, Rodrigo and Knights, Peter (2011). Critical spare parts ordering decisions using conditional reliability and stochastic lead time. 8th International Mining Plant Maintenance Meeting (MAPLA 2011), Antofagasta, Chile, 7-9 September 2011. Santiago, Chile: Gecamin.

Critical spare parts ordering decisions using conditional reliability and stochastic lead time

2011

Book Chapter

Mine infrastructure maintenance

Kumar, Uday, Knights, Peter and Kuruppu, Mahinda (2011). Mine infrastructure maintenance. SME mining engineering handbook. (pp. 825-838) edited by Peter Darling. Colorado, USA: Society for Mining, Metallurgy, and Exploration.

Mine infrastructure maintenance

2011

Conference Publication

Types and traps: R&D consortia and developmental pitfalls

Pinto, Pablo E., Hine, Damian and Knights, Peter (2011). Types and traps: R&D consortia and developmental pitfalls. DRUID Society Conference 2011 on Innovation, Strategy and Structure - Organizations, Institutions, Systems and Regions, Copenhagen, Denmark, 15-17 June 2011. Copenhagen, Denmark: DRUID Society.

Types and traps: R&D consortia and developmental pitfalls

2011

Conference Publication

Improving truck-shovel matching

Nel, S., Kizil, M. S. and Knights, P. (2011). Improving truck-shovel matching. 35th APCOM Symposium, Wollongong, NSW, Australia, 24-30 September 2011. Carlton, VIC, Australia: Australasian Institute of Mining and Metallurgy.

Improving truck-shovel matching

2011

Conference Publication

Doing more with less: How to improve maintainance labour utilisation

Knights, Peter (2011). Doing more with less: How to improve maintainance labour utilisation. 8th International Mining Plant Maintenance Meeting (MAPLA 2011), Antofagasta, Chile, 7-9 September 2011. Santiago, Chile: Gecamin.

Doing more with less: How to improve maintainance labour utilisation

2011

Conference Publication

Mine data analytics - New skills required for tomorrow's mines

Knights, P. and Liang, L. (2011). Mine data analytics - New skills required for tomorrow's mines. Second International Future Mining Conference, Sydney, Australia, 22 - 23 November 2011. Carlton, Australia: The Australasian Institute of Mining & Metallurgy.

Mine data analytics - New skills required for tomorrow's mines

2011

Journal Article

Simultaneous optimisation of stope layouts and long term production schedules

Little, J., Topal, E. and Knights, P. (2011). Simultaneous optimisation of stope layouts and long term production schedules. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 120 (3), 129-136. doi: 10.1179/1743286311Y.0000000011

Simultaneous optimisation of stope layouts and long term production schedules

2010

Journal Article

Coal and the Commonwealth: The greatness of an Australian resource

Knights, Peter and Hood, Michael (2010). Coal and the Commonwealth: The greatness of an Australian resource. AusIMM Bulletin (1), 48-50.

Coal and the Commonwealth: The greatness of an Australian resource

2010

Conference Publication

Autonomous surface mining equipment: is bigger better?

Knights, Peter and Franklin, Dennis (2010). Autonomous surface mining equipment: is bigger better?. 2010 Australian Mining Technology Conference, Perth, Western Australian, 13-15 September 2010. Pinjarra Hills, Qld, Australia: CRC Mining.

Autonomous surface mining equipment: is bigger better?

2010

Journal Article

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming

Nehring, M., Topal, E. and Knights, P. (2010). Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 (4), 212-220. doi: 10.1179/1743286310Y.0000000001

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming

2010

Conference Publication

Creating competitive advantage in mining: An illustrative comparison with the oil industry

Garcia, Jose, Juan Camus and Knights, Peter (2010). Creating competitive advantage in mining: An illustrative comparison with the oil industry. The Fourth International Conference on Mining Innovation, Santiago, Chile, 23-25 June 2010. Santiage, Chile: Gecamin.

Creating competitive advantage in mining: An illustrative comparison with the oil industry

2010

Conference Publication

Incorporating econometric price models in real options valuation of mining projects

Shafiee, Shahriar and Knights, Peter (2010). Incorporating econometric price models in real options valuation of mining projects. 2010 Australian Mining Technology Conference, Perth, W.A., Australia, 13-15 September 2010. Pinjarra Hills, Qld., Australia: CRC Mining.

Incorporating econometric price models in real options valuation of mining projects

Funding

Current funding

  • 2024 - 2027
    Development of machine health indicators RUL algorithms and intervention actions for select Cat793C components
    PT Bukit Teknologi Digital
    Open grant
  • 2023 - 2028
    ARC Training Centre for Innovative Composites for the Future of Sustainable Mining Equipment (ARC ITRP administered by the University of Wollongong)
    University of Wollongong
    Open grant

Past funding

  • 2022 - 2023
    Research Services to Elaborate a Road Map for the Mine Design 4 ESG Initiative
    Anglo American Technical & Sustainability Services
    Open grant
  • 2022
    Loadscan White Paper
    Loadscan Australia Pty Ltd
    Open grant
  • 2022 - 2023
    Tyre Handler Testing Rig Stage 2: Lifting guidelines
    Australian Coal Association Research Program
    Open grant
  • 2020 - 2021
    Design, construction and commissioning of a skid-mounted tyre handler testing rig
    Australian Coal Research Limited
    Open grant
  • 2019 - 2021
    Design optimisation of Cascade Australia's Tyre handler
    Innovation Connections
    Open grant
  • 2019 - 2020
    Trail of Dragline Chain Innovation, Stage 3: Hoist Chain Site Trial and Cost/Benefit Analysis
    Cast Equipment & Chain Products Pty Ltd
    Open grant
  • 2018 - 2019
    Product innovation project: cascade tyre handler
    Innovation Connections
    Open grant
  • 2014
    True triaxial cell for advanced testing of porous media
    UQ Major Equipment and Infrastructure
    Open grant
  • 2009 - 2014
    CRC Mining ongoing funding
    Cooperative Research Centre for Mining
    Open grant

Supervision

Availability

Professor Peter Knights is:
Available for supervision

Before you email them, read our advice on how to contact a supervisor.

Supervision history

Current supervision

Completed supervision

Media

Enquiries

For media enquiries about Professor Peter Knights's areas of expertise, story ideas and help finding experts, contact our Media team:

communications@uq.edu.au