Skip to menu Skip to content Skip to footer
Ms Lizette Verster
Ms

Lizette Verster

Email: 
Phone: 
+61 7 336 55832

Overview

Background

Lizette specialises in applying technical knowledge and research outcomes in industrial applications to improve process performance.

Lizette holds a Bachelor of Engineering Honours degree in Control Engineering from the University of Pretoria, South Africa and is a minerals processing engineer with more than 15 years industrial experience that joined the JKMRC in 2019. She has extensive experience in processing of precious group metals (PGM’s), copper and iron ore.

She has been involved in a number of commissiong projects, including ultra-fine grinding circuits with optimisation of the downstream flotation circuits and the commissioning and operation of gravity separation plants for the treatment of low grade iron ore. She has also implemented metallurgical ore characterisation test programs in PGM and iron ore processing.

Availability

Ms Lizette Verster is:
Available for supervision

Qualifications

  • Bachelor (Honours) of Engineering, University of Pretoria

Research interests

  • Novel Flotation Technologies

    Understanding and characterising novel flotation technologies, such as the Jameson cell and fluidised bed flotation, to increase minerals processing efficiency and improve mining sustainability.

Research impacts

During her work she collaborates with multi-disciplinary teams in areas ranging from commissioning, process operations, supply chain and mine planning as well as metallurgical technical services. She is passionate about technology transfer and implementing research outcomes in industrial applications and regularly trains and mentors operational personnel.

Lizette uses her industry experience to conduct applied research aiming to address future challenges of the mining and minerals processing industry. Her current focus is on understanding and optimising novel flotation technologies for example the Jameson cell and fluidised bed flotation.

Works

Search Professor Lizette Verster’s works on UQ eSpace

30 works between 2020 and 2024

21 - 30 of 30 works

2022

Other Outputs

Fluorine management in mineral processing operations - a review

Brito e Abreu, Susana, Yenial Arslan, Unzile, Verster, Lizette and Forbes, Liza (2022). Fluorine management in mineral processing operations - a review. Brisbane, QLD, Australia: The University of Queensland.

Fluorine management in mineral processing operations - a review

2022

Other Outputs

Collaborative consortium for coarse particle processing research Q4 2022 technical report

Forbes, Liza, Runge, Kym, Yahyaei, Mohsen, Verster, Lizette, Awatey, Bellson, Miceli, Hayla, Yanez, German Lastra and Skliar, Anna (2022). Collaborative consortium for coarse particle processing research Q4 2022 technical report. Brisbane, QLD, Australia: Sustainable Minerals Institute.

Collaborative consortium for coarse particle processing research Q4 2022 technical report

2022

Conference Publication

Techno-economic implications of implementing novel reagents to improve fines recovery in mineral flotation

Franks, G. V. , Lowjun, S. , Thomas, C. A., Forbes, E. , Runge, K. and Verster, I. (2022). Techno-economic implications of implementing novel reagents to improve fines recovery in mineral flotation. IMPC Asia Pacific 2022, Melbourne, Australia, 22-24 August 2022.

Techno-economic implications of implementing novel reagents to improve fines recovery in mineral flotation

2022

Other Outputs

Collaborative consortium for coarse particle processing research Q1 2022 technical report

Forbes, Liza, Runge, Kym, Yahyaei, Mohsen, Morrison, Angus, Verster, Lizette, Awatey, Bellson, Diba, Farhana, Miceli, Hayla, Yanez, German Lastra, Skliar, Anna, Arslan, Unzile Yenial and Jockovic, Vladimir (2022). Collaborative consortium for coarse particle processing research Q1 2022 technical report. Brisbane, QLD Australia: Sustainable Minerals Institute.

Collaborative consortium for coarse particle processing research Q1 2022 technical report

2022

Other Outputs

Data relating to the Complex Orebodies Review of the Izok Lake Corridor Project (Izok-Dataroom-UQ)

Micklethwaite, Steven, Verster, Lizette, Antonio, Christian, Ziemski, Marcin, Hilden, Marco, Ghoreishi-Madiseh, Ali, Kuyuk, Ali, Kalantari, Hossein, Sasmito, Agus, Hernandez-Santin, Lorna, Erskine, Peter, Cote, Claire, Lebre, Eleanor and Seligman, Benjamin (2022). Data relating to the Complex Orebodies Review of the Izok Lake Corridor Project (Izok-Dataroom-UQ). The University of Queensland. (Dataset) doi: 10.48610/9a95ed5

Data relating to the Complex Orebodies Review of the Izok Lake Corridor Project (Izok-Dataroom-UQ)

2022

Conference Publication

Novel ‘Complex Orebodies Approach’ to assess deposit feasibility in minerals processing design

Verster, I., Antonio, C., Hilden, M., Ziemski, M., Seligmann, B., Micklethwaite, S., Ghoreishi-Madiseh, S.A., Lamb, A., Qian, B., Car, M. and Valenta, R. (2022). Novel ‘Complex Orebodies Approach’ to assess deposit feasibility in minerals processing design. Integration, Optimisation and Design of Mineral Processing Circuits '22, Online, 13-14 June 2022.

Novel ‘Complex Orebodies Approach’ to assess deposit feasibility in minerals processing design

2021

Other Outputs

A complex orebodies review of the Izok Lake Corridor Project: final report 1

Verster, Lizette, Antonio, Christian and Ziemski, Marcin (2021). A complex orebodies review of the Izok Lake Corridor Project: final report 1. Brisbane, QLD Australia: Sustainable Minerals Institute.

A complex orebodies review of the Izok Lake Corridor Project: final report 1

2021

Other Outputs

GLENCON10 - Circuit Survey of Mt Isa Copper Concentrator Pre-Float Circuit

Lizette Verster, Kym Runge and Susana Brito e Abreu (2021). GLENCON10 - Circuit Survey of Mt Isa Copper Concentrator Pre-Float Circuit. Brisbane: Sustainable Minerals Institute - JKMRC.

GLENCON10 - Circuit Survey of Mt Isa Copper Concentrator Pre-Float Circuit

2021

Other Outputs

GLENCON10 - circuit survey of Mt Isa copper concentrator pre-float circuit - ToF-SIMS analysis

Brito e Abreu, Susana, Verster, Lizette, Forbes, Liza and Runge, Kym (2021). GLENCON10 - circuit survey of Mt Isa copper concentrator pre-float circuit - ToF-SIMS analysis. Brisbane, QLD Australia: Sustainable Minerals Institute - Julius Kruttschnitt Mineral Research Centre.

GLENCON10 - circuit survey of Mt Isa copper concentrator pre-float circuit - ToF-SIMS analysis

2020

Conference Publication

Application of new technologies for remote operational support in metallurgical plants

Yahyaei, Mohsen, Verster, Isabella, Wong, Bevin, Valenta, Rick, Ziemski, Marcin and O'Donnell, Roxanne (2020). Application of new technologies for remote operational support in metallurgical plants. 16th International Mineral Processing Conference, Santiago, Chile (Online), 23-27 November 2020. Santiago, Chile: Universidad de Concepción.

Application of new technologies for remote operational support in metallurgical plants

Funding

Current funding

  • 2024 - 2027
    Optimising future copper production in the NW Mineral Province -Stage 1 scoping
    Queensland Department of Resources
    Open grant
  • 2023 - 2025
    Newcrest - Evaluation of Classification Options
    NewCrest Mining Limited
    Open grant

Past funding

  • 2023 - 2024
    Predictive modelling
    Anglo American Services (UK) Ltd
    Open grant
  • 2023 - 2025
    Testing an approach to model liberation across a regrind
    Anglo American Services (UK) Ltd
    Open grant
  • 2023
    Pre-concentration of Vecco Vanadium Ore to Reject Calcite Bearing Minerals - Phase 3
    VECCO GROUP PTY LTD
    Open grant
  • 2023
    Flotation of Calcite Bearing Minerals to Upgrade Vanadium Content
    Innovation Connections
    Open grant
  • 2021 - 2022
    Development of integrated process models in IES and technology transfer
    AngloGold Ashanti Australia Limited
    Open grant
  • 2021 - 2025
    Hybrid Microwave Technology for Dry Stacked Tailings Applications
    Australian Coal Association Research Program
    Open grant
  • 2021
    A Complex Orebodies Review of the Izok Lake Corridor Project (304MMGIZOK)
    MMG Australia Limited
    Open grant
  • 2020 - 2021
    Circuit survey of Mt Isa Copper Concentrator Pre-Float Circuit (Mt Isa Copper Concentrator Improvement Projects Project 10: GLENCON10
    Mount Isa Mines Limited
    Open grant
  • 2019
    Hellyer Gold Mines
    Hellyer Gold Mines Pty Ltd
    Open grant

Supervision

Availability

Ms Lizette Verster is:
Available for supervision

Before you email them, read our advice on how to contact a supervisor.

Supervision history

Current supervision

Media

Enquiries

For media enquiries about Ms Lizette Verster's areas of expertise, story ideas and help finding experts, contact our Media team:

communications@uq.edu.au