2019 Journal Article Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operationsSinclair, N. and Nehring, M. (2019). Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations. Journal of the Southern African Institute of Mining and Metallurgy, 119 (1), 71-80. doi: 10.17159/2411-9717/2019/v119n1a9 |
2019 Conference Publication Ultimate pit limit determination for fully mobile in-pit crushing and conveying systemsHay, Edward, Nehring, Micah, Knights, Peter and Kizil, Mehmet S. (2019). Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems. 14th International Symposium of Continuous Surface Mining (ISCSM2018), Thessaloniki, Greece, 23-26 September 2018. Olney, Bucks, United Kingdom: Inderscience Publishers. doi: 10.1504/IJMME.2019.104444 |
2018 Journal Article Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mineTerblanche, Petrus J., Kearney, Michael P., Nehring, Micah and Knights, Peter F. (2018). Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine. Mining Technology, 128 (1), 51-64. doi: 10.1080/25726668.2018.1554933 |
2018 Journal Article A new methodology for the open-pit mine production scheduling problemSamavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2018). A new methodology for the open-pit mine production scheduling problem. Omega, 81, 169-182. doi: 10.1016/j.omega.2017.10.008 |
2018 Conference Publication Selection of precision surface mining methods for complex metalliferous orebodiesKnights, P. F., Kizil, M. S. and Nehring, M. (2018). Selection of precision surface mining methods for complex metalliferous orebodies. Complex Orebodies Conference 2018, Brisbane, QLD, Australia, 19-21 November 2018. Melbourne, VIC, Australia: Australasian Institute of Mining and Metallurgy. |
2018 Journal Article IPCC a real alternativeNehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). IPCC a real alternative. Coal International, 266 (4), 28-39. |
2018 Journal Article A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systemsNehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems. International Journal of Mining Science and Technology, 28 (2), 205-214. doi: 10.1016/j.ijmst.2017.12.026 |
2018 Conference Publication Open-pit mine production planning and scheduling: a research agendaSamavati, Mehran, Essam, Daryl L., Nehring, Micah and Sarker, Ruhul (2018). Open-pit mine production planning and scheduling: a research agenda. 24th Australian Society for Operations Research (ASOR) Conference, Canberra, Australia, 16-18 November 2016. Cham, Switzerland: Springer International. doi: 10.1007/978-3-319-55914-8_16 |
2017 Journal Article A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industrySamavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry. International Journal of Production Economics, 193, 12-20. doi: 10.1016/j.ijpe.2017.06.025 |
2017 Conference Publication Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous ProjectsGarcia, C.E.D., Scott, M. and Nehring, M. (2017). Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous Projects. Proceedings of the 2017 Mine Planning and Equipment Selection (MPES), Luleå, Sweden, 29-31 August 2017. |
2017 Journal Article Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programmingSalama, A., Nehring, M. and Greberg, J. (2017). Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming. Journal of the Southern African Institute of Mining and Metallurgy, 117 (4) v117n4a8, 365-372. doi: 10.17159/2411-9717/2017/v117n4a8 |
2017 Journal Article The equipment utilisation versus mining rate trade-off in open pit miningArteaga, Felipe, Nehring, Micah and Knights, Peter (2017). The equipment utilisation versus mining rate trade-off in open pit mining. International Journal of Mining, Reclamation and Environment, 32 (7), 1-24. doi: 10.1080/17480930.2017.1306674 |
2017 Journal Article A local branching heuristic for the open pit mine production scheduling problemSamavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A local branching heuristic for the open pit mine production scheduling problem. European Journal of Operational Research, 257 (1), 261-271. doi: 10.1016/j.ejor.2016.07.004 |
2016 Journal Article Integrated optimization of stope boundary selection and scheduling for sublevel stoping operationsCopland, T. and Nehring, M. (2016). Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations. The Journal of the South African Institute of Mining and Metallurgy, 116 (12), 1135-1142. doi: 10.17159/2411-9717/2016/v116n12a7 |
2016 Journal Article An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recoveryNehring, M. and Cheng, X. (2016). An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery. Journal of Cleaner Production, 127, 228-239. doi: 10.1016/j.jclepro.2016.03.162 |
2016 Conference Publication Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating timeDzakpata, Isaac, Knights, Peter, Kizil, Mehmet Siddik, Nehring, Micah and Aminossadati, Saiied Mostafa (2016). Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time. 2016 Coal Operators' Conference, Wollongong, Australia, 10-12 Feb 2016. Wollongong, Australia: The University of Wollongong Printery. |
2016 Conference Publication Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyondPinto, Pablo E., Hine, Damian C., Knights, Peter F. and Nehring, Micah (2016). Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyond. Academy of Management Meeting, Anaheim, California, 5 - 9 August 2016. Briarcliff Manor, NY, United States: Academy of Management. doi: 10.5465/AMBPP.2016.14430abstract |
2015 Journal Article Development of dozer push optimisation software for commodore coal mineUren, Z. and Nehring, M. (2015). Development of dozer push optimisation software for commodore coal mine. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 124 (4), 231-238. doi: 10.1179/1743286315Y.0000000017 |
2015 Journal Article Market structure differences impacting australian iron ore and metallurgical coal industriesLawrence, Kurt and Nehring, Micah (2015). Market structure differences impacting australian iron ore and metallurgical coal industries. Minerals, 5 (3), 473-487. doi: 10.3390/min5030473 |
2015 Journal Article Evaluation of the impact of commodity price change on mine plan of underground miningSalama, Abubakary, Nehring, Micah and Greberg, Jenny (2015). Evaluation of the impact of commodity price change on mine plan of underground mining. International Journal of Mining Science and Technology, 25 (3), 375-382. doi: 10.1016/j.ijmst.2015.03.008 |