Skip to menu Skip to content Skip to footer

2020

Journal Article

Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems

Hay, Edward, Nehring, Micah, Knights, Peter and Kizil, Mehmet S. (2020). Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems. International Journal of Mining and Mineral Engineering, 10 (2-4), 111-130. doi: 10.1504/ijmme.2019.10026187

Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems

2019

Conference Publication

Investigation of technical concepts and developments in implementation of pre-concentration technology in sublevel stope mines

Sotoudeh, Farzad, Nehring, Micah, Kizil, Mehmet and Knights, Peter (2019). Investigation of technical concepts and developments in implementation of pre-concentration technology in sublevel stope mines. Future Mining Conference, Sydney, NSW, Australia, 19 - 20 November 2019.

Investigation of technical concepts and developments in implementation of pre-concentration technology in sublevel stope mines

2019

Journal Article

Simultaneous optimization of stope layout and production scheduling in sublevel stoping method

Foroughi, Sorayya, Hamidi, Jafar Khademi, Monjezi, Masoud and Nehring, Micah (2019). Simultaneous optimization of stope layout and production scheduling in sublevel stoping method. Nashriyyah-i Muhandisi-i Ma'dan, 14 (43), 81-90. doi: 10.22034/IJME.2019.36641

Simultaneous optimization of stope layout and production scheduling in sublevel stoping method

2019

Journal Article

Determining the optimal orientation of ultimate pits for mines using fully mobile in-pit crushing and conveying systems

Hay, E., Nehring, M., Knights, P. and Kizil, M. S. (2019). Determining the optimal orientation of ultimate pits for mines using fully mobile in-pit crushing and conveying systems. Journal of the Southern African Institute of Mining and Metallurgy, 119 (11), 949-956. doi: 10.17159/2411-9717/104-252-1/2019

Determining the optimal orientation of ultimate pits for mines using fully mobile in-pit crushing and conveying systems

2019

Journal Article

The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)

Foroughi, Sorayya, Hamidi, Jafar Khademi, Monjezi, Masoud and Nehring, Micah (2019). The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II). Resources Policy, 63 101408, 101408. doi: 10.1016/j.resourpol.2019.101408

The integrated optimization of underground stope layout designing and production scheduling incorporating a non-dominated sorting genetic algorithm (NSGA-II)

2019

Journal Article

Ultimate pit limit determination for semi mobile in-pit crushing and conveying system: a case study

Hay, E., Nehring, M., Knights, P. and Kizil, M.S. (2019). Ultimate pit limit determination for semi mobile in-pit crushing and conveying system: a case study. International Journal of Mining, Reclamation and Environment, 34 (7), 1-21. doi: 10.1080/17480930.2019.1639006

Ultimate pit limit determination for semi mobile in-pit crushing and conveying system: a case study

2019

Conference Publication

Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems

Hay, Edward, Nehring, Micah, Knights, Peter and Kizil, Mehmet S. (2019). Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems. 14th International Symposium of Continuous Surface Mining (ISCSM2018), Thessaloniki, Greece, 23-26 September 2018. Olney, Bucks, United Kingdom: Inderscience Publishers. doi: 10.1504/IJMME.2019.104444

Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems

2019

Conference Publication

Economic and environmental impacts of utilising a pre-concentration process in underground metal mining

Sotoudeh, Farzad, Nehring, Micah, Kizil, Mehmet and Knights, Peter (2019). Economic and environmental impacts of utilising a pre-concentration process in underground metal mining. 28th International Symposium on Mine Planning and Equipment Selection (MPES 2019), Perth, WA, Australia, 2-4 December 2019. Cham, Switzerland: Springer International Publishing. doi: 10.1007/978-3-030-33954-8_40

Economic and environmental impacts of utilising a pre-concentration process in underground metal mining

2019

Journal Article

Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations

Sinclair, N. and Nehring, M. (2019). Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations. Journal of the Southern African Institute of Mining and Metallurgy, 119 (1), 71-80. doi: 10.17159/2411-9717/2019/v119n1a9

Dozer 'side-cutting' versus excavator side-casting on the highwall in dozer bulk push operations

2018

Journal Article

Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine

Terblanche, Petrus J., Kearney, Michael P., Nehring, Micah and Knights, Peter F. (2018). Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine. Mining Technology, 128 (1), 51-64. doi: 10.1080/25726668.2018.1554933

Potential of on-board energy recovery systems to reduce haulage costs over the life of a deep surface mine

2018

Journal Article

A new methodology for the open-pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2018). A new methodology for the open-pit mine production scheduling problem. Omega, 81, 169-182. doi: 10.1016/j.omega.2017.10.008

A new methodology for the open-pit mine production scheduling problem

2018

Conference Publication

Selection of precision surface mining methods for complex metalliferous orebodies

Knights, P. F., Kizil, M. S. and Nehring, M. (2018). Selection of precision surface mining methods for complex metalliferous orebodies. Complex Orebodies Conference 2018, Brisbane, QLD, Australia, 19-21 November 2018. Melbourne, VIC, Australia: Australasian Institute of Mining and Metallurgy.

Selection of precision surface mining methods for complex metalliferous orebodies

2018

Journal Article

IPCC a real alternative

Nehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). IPCC a real alternative. Coal International, 266 (4), 28-39.

IPCC a real alternative

2018

Journal Article

A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems

Nehring, M., Knights, P. F., Kizil, M. S. and Hay, E. (2018). A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems. International Journal of Mining Science and Technology, 28 (2), 205-214. doi: 10.1016/j.ijmst.2017.12.026

A comparison of strategic mine planning approaches for in-pit crushing and conveying, and truck/shovel systems

2018

Conference Publication

Open-pit mine production planning and scheduling: a research agenda

Samavati, Mehran, Essam, Daryl L., Nehring, Micah and Sarker, Ruhul (2018). Open-pit mine production planning and scheduling: a research agenda. 24th Australian Society for Operations Research (ASOR) Conference, Canberra, Australia, 16-18 November 2016. Cham, Switzerland: Springer International. doi: 10.1007/978-3-319-55914-8_16

Open-pit mine production planning and scheduling: a research agenda

2017

Journal Article

A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry. International Journal of Production Economics, 193, 12-20. doi: 10.1016/j.ijpe.2017.06.025

A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry

2017

Conference Publication

Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous Projects

Garcia, C.E.D., Scott, M. and Nehring, M. (2017). Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous Projects. Proceedings of the 2017 Mine Planning and Equipment Selection (MPES), Luleå, Sweden, 29-31 August 2017.

Economic Benefits and Technical Complexities of Grade Engineering® in Strategic Mine Planning of Metalliferous Projects

2017

Journal Article

Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming

Salama, A., Nehring, M. and Greberg, J. (2017). Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming. Journal of the Southern African Institute of Mining and Metallurgy, 117 (4) v117n4a8, 365-372. doi: 10.17159/2411-9717/2017/v117n4a8

Financial analysis of the impact of increasing mining rate in underground mining, using simulation and mixed integer programming

2017

Journal Article

The equipment utilisation versus mining rate trade-off in open pit mining

Arteaga, Felipe, Nehring, Micah and Knights, Peter (2017). The equipment utilisation versus mining rate trade-off in open pit mining. International Journal of Mining, Reclamation and Environment, 32 (7), 1-24. doi: 10.1080/17480930.2017.1306674

The equipment utilisation versus mining rate trade-off in open pit mining

2017

Journal Article

A local branching heuristic for the open pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2017). A local branching heuristic for the open pit mine production scheduling problem. European Journal of Operational Research, 257 (1), 261-271. doi: 10.1016/j.ejor.2016.07.004

A local branching heuristic for the open pit mine production scheduling problem