Skip to menu Skip to content Skip to footer

2016

Journal Article

Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations

Copland, T. and Nehring, M. (2016). Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations. The Journal of the South African Institute of Mining and Metallurgy, 116 (12), 1135-1142. doi: 10.17159/2411-9717/2016/v116n12a7

Integrated optimization of stope boundary selection and scheduling for sublevel stoping operations

2016

Journal Article

An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery

Nehring, M. and Cheng, X. (2016). An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery. Journal of Cleaner Production, 127, 228-239. doi: 10.1016/j.jclepro.2016.03.162

An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery

2016

Conference Publication

Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyond

Pinto, Pablo E., Hine, Damian C., Knights, Peter F. and Nehring, Micah (2016). Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyond. Academy of Management Meeting, Anaheim, California, 5 - 9 August 2016. Briarcliff Manor, NY, United States: Academy of Management. doi: 10.5465/AMBPP.2016.14430abstract

Dynamic life cycles of publicly funded R&D consortia: case analyses from mining and beyond

2016

Conference Publication

Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time

Dzakpata, Isaac, Knights, Peter, Kizil, Mehmet Siddik, Nehring, Micah and Aminossadati, Saiied Mostafa (2016). Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time. 2016 Coal Operators' Conference, Wollongong, Australia, 10-12 Feb 2016. Wollongong, Australia: The University of Wollongong Printery.

Truck and shovel versus in-pit conveyor systems: a comparison of the valuable operating time

2015

Journal Article

Development of dozer push optimisation software for commodore coal mine

Uren, Z. and Nehring, M. (2015). Development of dozer push optimisation software for commodore coal mine. Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 124 (4), 231-238. doi: 10.1179/1743286315Y.0000000017

Development of dozer push optimisation software for commodore coal mine

2015

Journal Article

Market structure differences impacting australian iron ore and metallurgical coal industries

Lawrence, Kurt and Nehring, Micah (2015). Market structure differences impacting australian iron ore and metallurgical coal industries. Minerals, 5 (3), 473-487. doi: 10.3390/min5030473

Market structure differences impacting australian iron ore and metallurgical coal industries

2015

Journal Article

Evaluation of the impact of commodity price change on mine plan of underground mining

Salama, Abubakary, Nehring, Micah and Greberg, Jenny (2015). Evaluation of the impact of commodity price change on mine plan of underground mining. International Journal of Mining Science and Technology, 25 (3), 375-382. doi: 10.1016/j.ijmst.2015.03.008

Evaluation of the impact of commodity price change on mine plan of underground mining

2015

Conference Publication

Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications

Dean, M., Knights, P., Kizil, M. S. and Nehring, M. (2015). Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications. AusIMM 2015 3rd International Future Mining Conference, Sydney, NSW, Australia, 4-6 Nov 2015. VIC, Australia: AusIMM.

Selection and planning of fully mobile in-pit crusher and conveyor systems for deep open pit metalliferous applications

2015

Journal Article

Development of Dozer Push Optimisation Software for Commodore Coal Mine

Uren, Z. and Nehring, M. (2015). Development of Dozer Push Optimisation Software for Commodore Coal Mine. Journal of Research Projects Review, 4 (1), 59-65.

Development of Dozer Push Optimisation Software for Commodore Coal Mine

2015

Conference Publication

First-year student engineers experience authentic practice with industry engagement

Aminossadati, Saiied M., Nehring, Micah, Hay, Edward, Kizil, Mehmet, Seib, Warren and Kavanagh, Lydia (2015). First-year student engineers experience authentic practice with industry engagement. Annual Conference of the Australasian Association for Engineering Education, Geelong, VIC, Australia, 6-9 December 2015. Victoria, Australia: School of Engineering Deakin University.

First-year student engineers experience authentic practice with industry engagement

2015

Conference Publication

A new branching scheme for the open pit mine production scheduling problem

Samavati, Mehran, Essam, Daryl, Nehring, Micah and Sarker, Ruhul (2015). A new branching scheme for the open pit mine production scheduling problem. CIE 45: 2015 International Conference on Computers and Industrial Engineering, Lorraine, France, 28 -30 October 2015. Lorraine, France: Universite de Lorraine.

A new branching scheme for the open pit mine production scheduling problem

2014

Journal Article

A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution

Smith, C. B., Nehring, M. and Bosompem, M. K. (2014). A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution. Journal of Research Projects Review, 3 (1), 63-68.

A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution

2014

Conference Publication

Schemes of exploitation in open pit mining

Arteaga, Felipe, Nehring, Micah, Knights, Peter and Camus, Juan (2014). Schemes of exploitation in open pit mining. 22nd MPES Conference, Dresden, Germany, 14–19 October 2013. Cham, Switzerland: Springer International Publishing. doi: 10.1007/978-3-319-02678-7_126

Schemes of exploitation in open pit mining

2013

Journal Article

Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process

Yap, A., Saconi, F., Nehring, M., Arteaga, F., Pinto, P., Asad, M. W. A., Ozhigin, S., Ozhigina, S., Mozer, D., Nagibin, A., Pul, E., Shvedov, D., Ozhigin, D., Gorokhov, D. and Karatayeva, V. (2013). Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process. Minerals Engineering, 53, 74-83. doi: 10.1016/j.mineng.2013.06.005

Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process

2013

Journal Article

Operating value optimization using simulation and mixed integer programming

Salama, Abubakary, Nehring, Micah and Greberg, Jenny (2013). Operating value optimization using simulation and mixed integer programming. International Journal of Mining, Reclamation and Environment, 28 (1), 25-46. doi: 10.1080/17480930.2013.768019

Operating value optimization using simulation and mixed integer programming

2012

Journal Article

Integrated short- and medium-term underground mine production scheduling

Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012). Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 (5), 365-378.

Integrated short- and medium-term underground mine production scheduling

2011

Other Outputs

Integrated Production Schedule Optimisation for Sublevel Stoping Mines

Nehring, Micah (2011). Integrated Production Schedule Optimisation for Sublevel Stoping Mines. PhD Thesis, School of Mechanical and Mining Engineering, The University of Queensland.

Integrated Production Schedule Optimisation for Sublevel Stoping Mines

2010

Journal Article

A new mathematical programming model for production schedule optimization in underground mining operations

Nehring, M., Topal, E. and Little, J. (2010). A new mathematical programming model for production schedule optimization in underground mining operations. Journal of the South African Institute of Mining and Metallurgy, 110 (8), 437-446.

A new mathematical programming model for production schedule optimization in underground mining operations

2010

Conference Publication

An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling

Nehring, M., Topal, E., Kizil, M. and Knights, P. (2010). An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling. MPES2010: Mine Planning and Equipment Selection, Freemantle, Western Australia, 1-3 December, 2010. London , United Kingdom: IOM3.

An investigation to integrate optimum long-term planning with short planning in underground mine production scheduling

2010

Journal Article

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming

Nehring, M., Topal, E. and Knights, P. (2010). Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 (4), 212-220. doi: 10.1179/1743286310Y.0000000001

Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming