|
2008 Conference Publication A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope miningLittle, J., Nehring, M. and Topal, E. (2008). A new mixed-integer programming model for mine production scheduling optimisation in sublevel stope mining. 2008 Australian Mining Techology Conference, Twin Waters, Sunshine Coast, QLD, 16-18 September, 2008. Victoria, Australia: The Australasian Institute of Mining and Metallurgy. |
|
2007 Conference Publication Mixed integer programming model for mine production scheduling of sublevel stoping operationNehring, M. and Topal, E. (2007). Mixed integer programming model for mine production scheduling of sublevel stoping operation. 2007 Australian Mining Technology Conference, The Vines, WA Australia, 2-4 October 2007. Melbourne, VIC Australia: Australasian Institute of Mining and Metallurgy. |
|
2007 Conference Publication Production schedule optimisation in underground hard rock mining using mixed integer programmingNehring, M. and Topal, E. (2007). Production schedule optimisation in underground hard rock mining using mixed integer programming. Project Evaluation Conference 2007, Melbourne, Victoria, 19-20 June 2007. Melbourne, Victoria: The Australasian Institute of Mining and Metallurgy. |
|
2006 Other Outputs Stope sequencing and optimisation in underground hardrock miningNehring, Micah (2006). Stope sequencing and optimisation in underground hardrock mining. B.Sc Thesis, School of Engineering, The University of Queensland. doi: 10.14264/338655 |